Turret Suction Piles for FPSO (Year 2015)

  • Project type: Oil and Gas suction pile fabrication.
  • Location: U.S. Gulf of Mexico.
  • Scope of work: Fabrication of 10 20 foot in diameter suction piles by 93.5 feet long weighing 275 tons each.
  • Challenges: No major challenges and we easily adapted to diameter of piles.
  • Delivery time: 12 months fabrication time.