Mooring Suction Piles (Year 2013)

  • Project type: Oil and Gas suction pile fabrication.
  • Location: U.S. Gulf of Mexico.
  • Scope of work: Fabrication of 10 18 foot in diameter suction piles by 112 feet long weighing 265 tons each.
  • Challenges faced: Length and weight caused challenges with final loadout execution.
  • Delivery time: About 12 months fabrication time.