West Branch Bypass Tunnel for City Water Supply2017New YorkProvision of 230 interliner pipes each being 16’ x 40’ long (total 10,000 tons)
Turret Suction Piles for FPSO2015U.S. Gulf of MexicoFabrication of 10 20 foot in diameter suction piles by 93.5 feet long weighing 275 tons eac
Mooring Suction Piles2013U.S. Gulf of MexicoFabrication of 10 18 foot in diameter suction piles by 112 feet long weighing 265 tons each

Supporting Efforts Across Multiple Industry Sectors

  • Four-pile Support Structure
    Project type: Four-pile support structure. Location: Gulf of Mexico. Scope of work: Fabrication included jacket, piles, deck and helideck, totaling 3,023 tons. The final projects were delivered to the client via vessel.
  • Cargo Tanks
    Project type: Cargo tanks. Scope of work: Fabrication of ASME VIII Div. 1 coded 1,400 ton tanks, heat treated in PWHT furnace and transport
  • Suspension Bridge
    Project type: Suspension Bridge. Location: San Francisco. Scope of work: Monopiles weighing 5,500 tons for suspension bridge infrastructure transported by barge to build site.
  • Hurricane Support Structures
    Project type: Hurricane support structures. Location: Delivery to Gulf of Mexico. Scope of work: Monopiles and Pins weighing 900 tons fabricated and transported by vessel to destination.
  • Crude Oil Degassing Boot Modification
    Project type: Crude Oil Degassing Boot Modification. Scope of work: Fabrication of vortex cluster tube and buckets weighing 40 tons and transported by truck.
  • PLET Suction Piles
    Project type: PLET Suction Piles. Location: Gulf of Mexico delivery. Scope of work: Seven pieces weighing a total of 700 tons. Transported by barge to final destination.
  • West Branch Bypass Tunnel for City Water Supply (Year 2017)
    Project type: Interliner Pipe and Access Pipe. Location: New York. Scope of work: Provision of 230 interliner pipes each being 16’ x 40’ long (total 10,000 tons). Challenges: No significant challenges. Delivery time: 12 months.
  • Cargo Tanks for LPG Transportation Barge
    Project type: Oil and gas marine transportation. Location: U.S. inland and offshore waterways. Scope of work: Fabrication of four cargo tanks each being 17 feet diameter by 203 feet in length. Each tank weighed 350 tons. Challenges faced: Complex load out plan requiring multiple cranes.   Delivery time: 12 months fabrication time.
  • Turret Suction Piles for FPSO (Year 2015)
    Project type: Oil and Gas suction pile fabrication. Location: U.S. Gulf of Mexico. Scope of work: Fabrication of 10 20 foot in diameter suction piles by 93.5 feet long weighing 275 tons each. Challenges: No major challenges and we easily adapted to diameter of piles. Delivery time: 12 months fabrication time.
  • Mooring Suction Piles (Year 2013)
    Project type: Oil and Gas suction pile fabrication. Location: U.S. Gulf of Mexico. Scope of work: Fabrication of 10 18 foot in diameter suction piles by 112 feet long weighing 265 tons each. Challenges faced: Length and weight caused challenges with final loadout execution. Delivery time: About 12 months fabrication time.